Application for Survey License
![check-mark](https://www.nwrmap.info/new-frontend/image/icons/page 2/group-83.png)
Survey License Approved
![check-mark](https://www.nwrmap.info/new-frontend/image/icons/page 2/group-69.png)
Application for Generation License
![check-mark](https://www.nwrmap.info/new-frontend/image/icons/page 2/Path 15.png)
Under Construction
![check-mark](https://www.nwrmap.info/new-frontend/image/icons/page 2/group-40.png)
Live
Tinau was commissioned in 1978 near Butwal, but was recommissioned in 1983 after repair of flood damage. The project features two 250-kW turbine-generators, a 500-kW unit, a 2.4-kilometer tunnel, underground desilting chamber, and powerhouse.
Minimum Daily Discharge | 2.4 m3 /s |
---|---|
Design Discharge | 2.5 m3 /s |
Maximum Daily Discharge | 54 m3 /s |
Penstock- Length | 50 m |
---|---|
Penstock-Diameter | 1.275 m |
Total Length of Tunnel | 2,462 m |
Type | Francis |
---|---|
Number of Units | 3 |
Number of Generators | 3 |
---|
Application for Survey License
Survey License Approved
Application for Generation License
Under Construction
Live